[roll] Roll fuchsia [kernel][pi-tests] Improve resilience to VM time loss Improve the test resilience to VM time loss by checking the activation count of the active thread to ensure that it completes the spin phase within the same activation, maintaining the validity of the test conditions. Original-Original-Fixed: 513579775 Original-Original-Reviewed-on: https://fuchsia-review.googlesource.com/c/fuchsia/+/1614268 Original-Original-Revision: 81b6620375c165e3f3a0b2af8864b36e484da869 GitOrigin-RevId: e97c15c0b2b1c1a74a1b516e1532a3655a615236 Change-Id: I6cfb027407fcb7bc7e67403e921db0bb9020634f Reviewed-on: https://fuchsia-review.googlesource.com/c/integration/+/1614492 Cr-Commit-Position: refs/heads/main@{#192841}
This repository contains Fuchsia's Global Integration manifest files.
All changes should be made to the internal version of this repository. Our infrastructure automatically updates this version when the internal one changes.
Currently all changes must be made by a Google employee. Non-Google employees wishing to make a change can ask for assistance in one of the communication channels documented at get involved.
First install Jiri.
Next run:
$ jiri init $ jiri import minimal https://fuchsia.googlesource.com/integration $ jiri update
Third party projects should have their own subdirectory in ./third_party.