[roll] Roll infra/recipes [checkout] Pass patches.json projects as -local-manifest-project

Now that projects besides integration.git contain Jiri manifests, we
need to make sure that the second `jiri update` call respects changed
manifests in any projects that were patched, including projects that
were patched due to inclusion in patches.json.

Original-Bug: 385378627
Original-Reviewed-on: https://fuchsia-review.googlesource.com/c/infra/recipes/+/1266205
Original-Revision: c170d58c27e514fc431639ee013782ee3ae887fc
GitOrigin-RevId: 40f5003a621c303d1cafe042db4ea5534f83e0ed
Change-Id: Iab9298f1111ddd614a8a498a415a688d9246748c
1 file changed
tree: dcc9ca8593b40d8a845a455ef2211a9d1f62d7d8
  1. ctf/
  2. git-hooks/
  3. infra/
  4. third_party/
  5. cts
  6. firmware
  7. flower
  8. jiri.lock
  9. MILESTONE
  10. minimal
  11. prebuilts
  12. README.md
  13. stem
  14. test_durations
  15. toolchain
README.md

Integration

This repository contains Fuchsia's Global Integration manifest files.

Making changes

All changes should be made to the internal version of this repository. Our infrastructure automatically updates this version when the internal one changes.

Currently all changes must be made by a Google employee. Non-Google employees wishing to make a change can ask for assistance in one of the communication channels documented at get involved.

Obtaining the source

First install Jiri.

Next run:

$ jiri init
$ jiri import minimal https://fuchsia.googlesource.com/integration
$ jiri update

Third party

Third party projects should have their own subdirectory in ./third_party.