[roll] Roll fuchsia [power] Configure integration test to run on real hardware

Multiply: power-manager-integration-test: 400

Original-Bug: b/365952558
Test: CQ
Original-Reviewed-on: https://fuchsia-review.googlesource.com/c/fuchsia/+/1122216
Original-Revision: 5ce0b16ed7b0b2e7c9424622f2147a9b52c11560
GitOrigin-RevId: 0453afae81a582e6d7f5e4321d36a7cced12ae33
Change-Id: I34e9e3795c461536a9d265ef0c311ff1f2562629
1 file changed
tree: c3e80b5544f0dfe3cfbdb8bdc36fcfbc6b6934cf
  1. ctf/
  2. git-hooks/
  3. infra/
  4. third_party/
  5. cts
  6. firmware
  7. flower
  8. jiri.lock
  9. MILESTONE
  10. minimal
  11. prebuilts
  12. README.md
  13. stem
  14. test_durations
  15. toolchain
README.md

Integration

This repository contains Fuchsia's Global Integration manifest files.

Making changes

All changes should be made to the internal version of this repository. Our infrastructure automatically updates this version when the internal one changes.

Currently all changes must be made by a Google employee. Non-Google employees wishing to make a change can ask for assistance in one of the communication channels documented at get involved.

Obtaining the source

First install Jiri.

Next run:

$ jiri init
$ jiri import minimal https://fuchsia.googlesource.com/integration
$ jiri update

Third party

Third party projects should have their own subdirectory in ./third_party.